Secure Switching Facility
Hooksett NH 

A very challenging project located in Hooksett NH, EDC completed a transfer switch upgrade to a functioning mobile switching facility. At no point in time could this facility loose cooling or power. EDC accomplished this by deploying 300KW of its own generators, along with 600KW of rented generators to back-feed critical panels. An existing Square D ISO Transfer switch gear was split apart and added two 3000A Russelectric transfer switches for redundancy. This was accomplished in 3 months on maintenance windows of 12am to 5am.,